Outside the Boeing plant in Everett, newly assembled 787s sit ready for delivery. The lineup includes new planes for LOT Polish Airlines, Japan Airlines and All Nippon Airways. Inside, the production line rolls on despite this week’s setbacks for the company’s newest jetliner. Dreamliner number 94 stands at the front of the line. It’s an order for Thomson Airways, which is set to be the first British airline to fly the Dreamliner.